Pour this product into the corresponding volume of water ten minutes before the construction site, stir for 60-120 seconds to fully dissolve, and wait for use when the solution becomes viscous and moist. . According to the type of concrete delivery equipment and the length of the delivery pump pipe, configure the solution and water volume according to the dosage.
1. When using a ground pump to pump concrete, pour the prepared lubricant solution into the hopper (if there is serious water leakage at the bottom of the hopper, it cannot be pumped) Repair, other containers need to be prepared), first open the positive pump and pressurize the pump, so that the lubricating agent solution enters the delivery pipe in front of the concrete, until all the lubricating agent is transported and discharged outside the construction site.
2. Prepare clean water, pour it into the bottom of the bucket, and transport it into the ground pump. Do not start construction until all the lubricating agent in the ground pump is discharged.