Epoxy curing agent Knowledge Key factors for construction of special lightweight gypsum mortar in winter

Key factors for construction of special lightweight gypsum mortar in winter

广告位

Key factors for construction of special lightweight gypsum mortar in winter

1. The temperature of the water used to mix the special lightweight gypsum mortar can be appropriately increased, but the water temperature should not be higher than 40°C. Try to avoid using mixing water with a temperature lower than 5°C. , it is strictly prohibited to use ice water to mix special lightweight gypsum mortar.

2. According to the conditions of the construction site, heating measures can be taken according to the environment of the construction site. Heating equipment can be electric heating equipment or water heating equipment. The use of open flames for heating is strictly prohibited. In addition, heating equipment should be placed on the construction site at least 2m away from the construction surface. It is strictly prohibited to use air blowing heating equipment or thermal radiation heating equipment to directly blow air or directly bake the building surface, otherwise it will cause the special lightweight gypsum mortar to lose water and affect the strength development.

3. The construction site should be enclosed with thermal insulation materials to prevent cold wind from blowing into the construction site and lowering the temperature. According to the conditions of the construction site, measures should be taken to combine insulation and heating to increase the temperature of the construction environment.

4. Construction sites that use electric heating measures should pay special attention to fire safety at the construction site and choose heating equipment that matches the power cord. Heating equipment should be protected within 24 hours during work, a sufficient number of fire extinguishing equipment should be equipped on site, and safety precautions should be taken.

1. The mixing and use of special lightweight gypsum mortar should follow the principle of "mix less, use quickly". Mixed lightweight plaster mortar should be used up before it hardens or freezes. It is strictly prohibited to use lightweight gypsum mortar that has frozen or melted after freezing.

2. When the ambient temperature of the construction site is lower than 5℃, it is strictly prohibited to spray the special lightweight gypsum mortar after construction for maintenance; During winter construction, the walls after construction and floors should not be sprayed with water.

3. During winter construction, even if appropriate heating measures are taken, the strength development of special lightweight gypsum mortar will be relatively slow.

4. The base surface of the special lightweight gypsum mortar building should not have any substances that will affect the bonding, such as ice, water, dust, oil, etc., and It should not be used on substrates below 5°C. In addition, its use in winter construction can greatly reduce the cost of positive temperature maintenance in winter construction, thereby speeding up construction efficiency and saving man-hours. </p

广告位
This article is from the Internet, does not represent the position of Epoxy curing agent, reproduced please specify the source.https://www.dmp-30.vip/archives/27722

author:

Previous article
Next article
Contact Us

Contact us

+86 - 152 2121 6908

Online consultation: QQ交谈

E-mail: info@newtopchem.com

Working hours: Monday to Friday, 9:00-17:30, closed on holidays
Follow wechat
Scan wechat and follow us

Scan wechat and follow us

Follow Weibo
Back to top
Home
Phone
Products
Search