On August 10, the domestic cis-butadiene rubber plant started to work stably, and some plants were scheduled to be shut down for maintenance in the later period. In the later period, the supply pressure of butadiene rubber is expected to drop slightly.

butadiene rubber company Equipment capacity (10,000 tons/year) start
Yantai Haopu 6 Two-line operation
Shandong Wanda 5 High load operation
Qixiang Tengda 9 High load operation
Qilu Petrochemical 7 Normal operation, planned to stop for maintenance in mid-August
Sichuan Petrochemical 15 Three-line operation
Maoming Petrochemical 10 High load operation
Yanshan Petrochemical 12+3 High-load operation of high-cis-butadiene plant
Yangzi Petrochemical 10 Shut down, plan to restart in September
Heze Kexin 8 Parking from August 9th
Taiwan Oaks Department 7.2 Normal operation, plan to stop for maintenance in the near future
Dushanzi Petrochemical 3 Run at full capacity
Xinjiang Lande 5 Run normally
Daqing Petrochemical 16 Reboot to normal operation
Liaoning Shengyou 3 Parking
Jinzhou Petrochemical 3 Run normally
Zhejiang Transfar 10+5 Run normally
Zhenhua Petrochemical 10 Run normally
Shandong Yihua 10 Run normally
Zhejiang Petrochemical 10 Restart from August 4th to gradually increase the load
广告位
This article is from the Internet, does not represent the position of Epoxy curing agent, reproduced please specify the source.https://www.dmp-30.vip/archives/2994

author:

Previous article
Next article
Contact Us

Contact us

+86 - 152 2121 6908

Online consultation: QQ交谈

E-mail: info@newtopchem.com

Working hours: Monday to Friday, 9:00-17:30, closed on holidays
Follow wechat
Scan wechat and follow us

Scan wechat and follow us

Follow Weibo
Back to top
Home
Phone
Products
Search