On August 10, the domestic cis-butadiene rubber plant started to work stably, and some plants were scheduled to be shut down for maintenance in the later period. In the later period, the supply pressure of butadiene rubber is expected to drop slightly.
butadiene rubber company | Equipment capacity (10,000 tons/year) | start |
Yantai Haopu | 6 | Two-line operation |
Shandong Wanda | 5 | High load operation |
Qixiang Tengda | 9 | High load operation |
Qilu Petrochemical | 7 | Normal operation, planned to stop for maintenance in mid-August |
Sichuan Petrochemical | 15 | Three-line operation |
Maoming Petrochemical | 10 | High load operation |
Yanshan Petrochemical | 12+3 | High-load operation of high-cis-butadiene plant |
Yangzi Petrochemical | 10 | Shut down, plan to restart in September |
Heze Kexin | 8 | Parking from August 9th |
Taiwan Oaks Department | 7.2 | Normal operation, plan to stop for maintenance in the near future |
Dushanzi Petrochemical | 3 | Run at full capacity |
Xinjiang Lande | 5 | Run normally |
Daqing Petrochemical | 16 | Reboot to normal operation |
Liaoning Shengyou | 3 | Parking |
Jinzhou Petrochemical | 3 | Run normally |
Zhejiang Transfar | 10+5 | Run normally |
Zhenhua Petrochemical | 10 | Run normally |
Shandong Yihua | 10 | Run normally |
Zhejiang Petrochemical | 10 | Restart from August 4th to gradually increase the load |