On August 4, the domestic butadiene rubber plant started to be stable as a whole. Daqing Petrochemical's butadiene rubber plant restarted at the end of July, and Zhejiang Petrochemical's butadiene rubber plant plans to restart in the near future. The supply pressure of butadiene rubber increased slightly compared with the previous period.
butadiene rubber company | Equipment capacity (10,000 tons/year) | start |
Yantai Haopu | 6 | Two-line operation |
Shandong Wanda | 5 | High load operation |
Qixiang Tengda | 9 | Run normally |
Qilu Petrochemical | 7 | Normal operation, planned to stop for maintenance in mid-August |
Sichuan Petrochemical | 15 | Three-line operation |
Maoming Petrochemical | 10 | Two-line operation |
Yanshan Petrochemical | 12+3 | High-load operation of high-cis-butadiene plant |
Yangzi Petrochemical | 10 | Shut down, plan to restart in September |
Heze Kexin | 8 | Two-line operation |
Taiwan Oaks Department | 7.2 | Run normally |
Dushanzi Petrochemical | 3 | Run at full capacity |
Xinjiang Lande | 5 | Run normally |
Daqing Petrochemical | 16 | Reboot to normal operation |
Liaoning Shengyou | 3 | Parking |
Jinzhou Petrochemical | 3 | Run normally |
Zhejiang Transfar | 10+5 | Run normally |
Zhenhua Petrochemical | 10 | Run normally |
Shandong Yihua | 10 | Run normally |
Zhejiang Petrochemical | 10 | Shut down for maintenance, plan to restart soon |