Epoxy curing agent News SunSir: Domestic Butadiene Rubber Plant Dynamics on August 4th

SunSir: Domestic Butadiene Rubber Plant Dynamics on August 4th

广告位

SunSir: Domestic Butadiene Rubber Plant Dynamics on August 4th


On August 4, the domestic butadiene rubber plant started to be stable as a whole. Daqing Petrochemical's butadiene rubber plant restarted at the end of July, and Zhejiang Petrochemical's butadiene rubber plant plans to restart in the near future. The supply pressure of butadiene rubber increased slightly compared with the previous period.

butadiene rubber company Equipment capacity (10,000 tons/year) start
Yantai Haopu 6 Two-line operation
Shandong Wanda 5 High load operation
Qixiang Tengda 9 Run normally
Qilu Petrochemical 7 Normal operation, planned to stop for maintenance in mid-August
Sichuan Petrochemical 15 Three-line operation
Maoming Petrochemical 10 Two-line operation
Yanshan Petrochemical 12+3 High-load operation of high-cis-butadiene plant
Yangzi Petrochemical 10 Shut down, plan to restart in September
Heze Kexin 8 Two-line operation
Taiwan Oaks Department 7.2 Run normally
Dushanzi Petrochemical 3 Run at full capacity
Xinjiang Lande 5 Run normally
Daqing Petrochemical 16 Reboot to normal operation
Liaoning Shengyou 3 Parking
Jinzhou Petrochemical 3 Run normally
Zhejiang Transfar 10+5 Run normally
Zhenhua Petrochemical 10 Run normally
Shandong Yihua 10 Run normally
Zhejiang Petrochemical 10 Shut down for maintenance, plan to restart soon
广告位
This article is from the Internet, does not represent the position of Epoxy curing agent, reproduced please specify the source.https://www.dmp-30.vip/archives/3065

author:

Previous article
Next article
Contact Us

Contact us

+86 - 152 2121 6908

Online consultation: QQ交谈

E-mail: info@newtopchem.com

Working hours: Monday to Friday, 9:00-17:30, closed on holidays
Follow wechat
Scan wechat and follow us

Scan wechat and follow us

Follow Weibo
Back to top
Home
Phone
Products
Search