On July 12, the domestic butadiene rubber plant started to fluctuate slightly. Qixiang Tengda's butadiene rubber plant stopped for maintenance on the 7th and plans to restart on the 15th; Yangzi Petrochemical's butadiene rubber plant postponed restart; Shandong Wanda's butadiene rubber plant plans Restart around July 15th. The supply pressure of butadiene rubber is expected to increase slightly in the later stage.
butadiene rubber company | Equipment capacity (10,000 tons/year) | start |
Yantai Haopu | 6 | Run normally |
Shandong Wanda | 5 | Parking for maintenance |
Qixiang Tengda | 9 | Shut down for maintenance from July 7 |
Qilu Petrochemical | 7 | Run normally |
Sichuan Petrochemical | 15 | Three-line operation |
Maoming Petrochemical | 10 | Two-line operation |
Yanshan Petrochemical | 12+3 | High-load operation of high-cis-butadiene plant |
Yangzi Petrochemical | 10 | Parking |
Shengyu Chemical Industry | 8 | Two-line operation |
Taiwan Oaks Department | 7.2 | Run normally |
Dushanzi Petrochemical | 3 | Run at full capacity |
Xinjiang Lande | 5 | Run normally |
Daqing Petrochemical | 16 | Parking for maintenance |
Liaoning Shengyou | 3 | Parking |
Jinzhou Petrochemical | 3 | Run normally |
Zhejiang Transfar | 10+5 | Run normally |
Zhenhua Petrochemical | 10 | Run normally |
Shandong Yihua | 10 | Run normally |
Zhejiang Petrochemical | 10 | Production of nickel-based butadiene rubber |