Epoxy curing agent News The total investment is 35.981 billion! Containing 360 000 tons/year of BDO the new project of Shaanxi Coal and Gansu is promoted

The total investment is 35.981 billion! Containing 360 000 tons/year of BDO the new project of Shaanxi Coal and Gansu is promoted

广告位

Recently, the first meeting of the first board of directors of Shaanxi Gansu Investment Co., Ltd. (hereinafter referred to as “Gansu Investment Company”) and the general meeting of all employees were successfully held. Assistant to the general manager of Shaanxi Coal Group, Song Shijie, chairman of Yulin Chemical Company and Gansu Investment Company, attended the meeting and delivered a speech.

At the board meeting, all directors voted on the proposals submitted to the meeting one by one, and the meeting unanimously passed the “Basic Management System of Shaanxi Coal Group Gansu Investment Co., Ltd.” item motion.

At the subsequent meeting of all employees, the deputy general manager of the company made a detailed report on the current situation of the company’s operation and management, the progress of key tasks and existing problems.

Focusing on the company’s target positioning and development direction, Song Shijie pointed out that the Yumen New Energy Degradable Materials Carbon Neutral Industrial Park Project is the first tens of billions of multi-format energy and chemical projects invested by Shaanxi Coal Group outside the province , Gansu Investment Company must unify its thinking and understanding, strengthen its development beliefs, seize development opportunities, and deeply understand the role of project investment and construction in anchoring the country’s “double carbon” goals, promoting the group’s industrial transformation, and promoting high-quality local economic and social development of significance.

Song Shijie requested that, first, the top-level design of the project should be strengthened and the design optimized. It is necessary to in-depth study the technical characteristics of the “source, network, load, and storage” integrated project, strengthen the top-level design, do a good job in thematic demonstration and design optimization of product plans and basic designs, and reserve space for the smooth operation of the project and future technological transformation.

The second is to strictly implement unified regulations and implement standardization requirements. It is necessary to comprehensively learn from the management achievements, management experience and management system of Yulin Chemical Company, strengthen the promotion and application of information platform and standardization results, strictly implement the target plan, continuously improve management efficiency and standardize management behavior.

The third is to strengthen the application of information technology and realize digital delivery. It is necessary to clarify the requirements for digital delivery during the EPC bidding stage, strengthen communication and docking with various design units, and fully realize the digital delivery of projects.

The fourth is to strengthen the study of theoretical knowledge and improve the management system structure. It is necessary to further strengthen the study and implementation of management knowledge, management system, and business knowledge, and strengthen the education and training of new employees.

Yumen New Energy Degradable Materials Carbon Neutral Industrial Park Project

Shaanxi Coal Group Gansu Investment Co., Ltd. Yumen New Energy Degradable Materials Carbon Neutral Industrial Park project was announced for the first time on July 26, 2022. It is reported that the project is located in Yumen East Building Materials Chemical Industrial Park, Yumen Economic Development Zone, Gansu Province, with a total investment of 35.981 billion yuan and a total area of ​​about 112,000 mu. The project builds 600,000 tons/year of degradable materials, including 360,000 tons/year of BDO devices, 60,000 tons/year of PBS devices, 300,000 tons/year of PBAT devices, 100,000 tons/year of PBT devices, and 10,000 Nm3/h electrolytic water system Hydrogen device, and 400,000 tons/year acetylene raw material preparation device (calcium carbide method), 120,000 tons/year acetylene device, 25,000 Nm3/h acetylene raw material tail gas hydrogen production device, 750,000 tons/year formaldehyde device and other production devices; boilers and other public utilities Engineering: environmental protection, fire protection, safety and other facilities and supporting auxiliary facilities.

广告位
This article is from the Internet, does not represent the position of Epoxy curing agent, reproduced please specify the source.https://www.dmp-30.vip/archives/4630

author:

Previous article
Next article
Contact Us

Contact us

+86 - 152 2121 6908

Online consultation: QQ交谈

E-mail: info@newtopchem.com

Working hours: Monday to Friday, 9:00-17:30, closed on holidays
Follow wechat
Scan wechat and follow us

Scan wechat and follow us

Follow Weibo
Back to top
Home
Phone
Products
Search