Epoxy curing agent News SunSir: The start-up of the butadiene rubber plant on May 29

SunSir: The start-up of the butadiene rubber plant on May 29

广告位

SunSir: The start-up of the butadiene rubber plant on May 29


On May 29th, the butadiene rubber plant was started.

butadiene rubber company Equipment capacity (10,000 tons/year) start
Yantai Haopu 6 Run normally after reboot on May 12th
Shandong Wanda 5 Run normally
Qixiang Tengda 9 Three-line operation
Qilu Petrochemical 7 Run normally
Sichuan Petrochemical 15 Three-line operation
Maoming Petrochemical 10 60% load operation
Yanshan Petrochemical 12+3 Gao Shun Shun Ding plant will stop on the 15th
Yangzi Petrochemical 10 Parking
Shengyu Chemical Industry 8 Line-line operation
Taiwan Oaks Department 7.2 Run normally
Dushanzi Petrochemical 3 Run at full capacity
Xinjiang Lande 5 Running normally after reboot on May 22
Daqing Petrochemical 16 80% load operation
Liaoning Shengyou 3 Parking
Jinzhou Petrochemical 3 Line-line operation
Zhejiang Transfar 10+5 Run normally
Zhenhua Petrochemical 10 Restart on May 23
Shandong Yihua 10 Parking
Zhejiang Petrochemical 10 Test run production BR 9000
广告位
This article is from the Internet, does not represent the position of Epoxy curing agent, reproduced please specify the source.https://www.dmp-30.vip/archives/4986

author:

Previous article
Next article
Contact Us

Contact us

+86 - 152 2121 6908

Online consultation: QQ交谈

E-mail: info@newtopchem.com

Working hours: Monday to Friday, 9:00-17:30, closed on holidays
Follow wechat
Scan wechat and follow us

Scan wechat and follow us

Follow Weibo
Back to top
Home
Phone
Products
Search