Epoxy curing agent News The civil engineering of the main device of Shanghai Jinshan Baling thermoplastic elastomer project started

The civil engineering of the main device of Shanghai Jinshan Baling thermoplastic elastomer project started

广告位

The civil engineering of the main device of Shanghai Jinshan Baling thermoplastic elastomer project started

On March 31, Shanghai Jinshan Baling New Materials Co., Ltd. held the opening ceremony of the main production device at the site of the SBC (thermoplastic elastomer) project with an annual output of 250,000 tons, and the civil engineering of the main device of the project was fully started.

The project is jointly funded and constructed by Baling Petrochemical and Shanghai Petrochemical. It is located in Shanghai Jinshan Second Industrial Zone. It adopts the green and environmentally friendly thermoplastic rubber SBS, SEBS, and SIS complete production technology with independent intellectual property rights of Baling Petrochemical. The annual production capacity is 250,000 tons. 10,000 tons of thermoplastic elastomer devices, including 140,000 tons of SBS per year, 50,000 tons of SEBS per year and 60,000 tons of SIS per year.

Since the beginning of the year, the Shanghai Jinshan Baling SBC Project Department has completed the design of architectural structural drawings, and organized the participating units to jointly improve the overall overall plan, formulate safeguard measures, and make preparations for construction; strengthen communication with local government departments, and obtained Shanghai Jinshan District Planning and Natural Resources Bureau Engineering Planning and Construction Permit. In the next stage, the construction unit is Shanghai Jinshan Baling SBC Project Department, the construction unit is Sinopec Tenth Construction Company, the design unit is Hunan Baili Engineering Company, the supervision unit is Shanghai Jinshen Supervision Company, and the third-party HSE management unit is Shanghai Runnuo Management Company Collaboration will be strengthened to jointly promote safe and high-quality construction of the project in accordance with the six major control requirements of safety, quality, progress, investment, contract, and integrity.

This project is one of the projects of Baling Petrochemical "going out of Baling and developing Baling". The development strategy of shifting materials to high-end and parks to ecology has been implemented, filling the gap that Sinopec has no thermoplastic rubber devices in East China, providing high-end thermoplastic rubber products for the Yangtze River Delta region, and further promoting Jinshan District's "two districts and one fort" The implementation of the strategy has boosted Shanghai's "North-South Transformation".

广告位
This article is from the Internet, does not represent the position of Epoxy curing agent, reproduced please specify the source.https://www.dmp-30.vip/archives/5306

author:

Previous article
Next article
Contact Us

Contact us

+86 - 152 2121 6908

Online consultation: QQ交谈

E-mail: info@newtopchem.com

Working hours: Monday to Friday, 9:00-17:30, closed on holidays
Follow wechat
Scan wechat and follow us

Scan wechat and follow us

Follow Weibo
Back to top
Home
Phone
Products
Search