Epoxy curing agent News Ningxia Nenghua s BDO plant standard transformation project was handed over smoothly

Ningxia Nenghua s BDO plant standard transformation project was handed over smoothly

广告位

Ningxia Nenghua s BDO plant standard transformation project was handed over smoothly

At 10:30 am on April 15th, the BDO device standard transformation project of Sinopec Great Wall Energy Chemical (Ningxia) Co., Ltd., undertaken by the Ningxia Energy and Chemical Engineering Project Department established by the Northwest Branch, successfully achieved the goal of the CCCC , which marks the successful conclusion of the labor competition of "working hard for 60 days and ensuring production on schedule".

At the handover ceremony, Yu Fugui, Deputy Manager of Equipment Engineering Department of Sinopec Ningxia Energy & Chemical Company, Han Yuehua, Deputy Manager of BDO Operation Department, Wang Zhanwu, Deputy Manager of Electrical Instrument Center, Yang Zhongyi, Project Director of Chongqing Chuanwei Petrochemical Engineering Co., Ltd., Sinopec Ningbo Engineering Co., Ltd. Huang Jian, design representative, Zhu Bo, general manager of Shijian Northwest Branch, and Teng Xiaojun, deputy general manager and chief engineer, attended the ceremony. Teng Xiaojun signed the CCCC certificate on behalf of the company.

Ningxia Nenghua's BDO plant standard transformation project is to carry out partial transformation of the original BDO plant and build a new acetylenization unit supporting project to solve the production problems that have been exposed since the BDO plant was put into operation, such as short catalyst replacement cycle and poor operation stability. Bottleneck problem. BDO after modification It can increase production by 45,000 tons per year, reduce unit consumption, achieve the ultimate goal of optimizing efficient economic operation, and help Ningxia Nenghua turn losses out of difficulties.

Since the official start of the project on February 17, 2022, when the new crown epidemic is rampant in Ningxia, the local government, Ningxia Energy and Chemical and the project department have invested a lot of manpower and material resources in epidemic prevention and anti-epidemic work. With strong support, the project department has overcome many difficulties. In the summer and autumn of 2022, the model has been assembled to complete the installation of the main frame of the reactor and the hoisting and placement of the core equipment reactor; Rush construction. After the Spring Festival, the project department judged the situation and held a labor competition of "working hard for 60 days and ensuring production on schedule" on the day of resuming work after the festival. Promoted, carried out the activities of "spreading safety culture, creating a safe construction site" and "experience area for high-altitude operations" to build a firm and solid safety management, effectively reducing the occurrence of safety accidents, and playing the role of the fighting fortress of the grassroots party branch; The labor competition of "working hard for 60 days and ensuring production on schedule" is moving forward in a smooth and orderly manner, and has contributed to the construction of the "BDO device standard transformation project"!

The project construction has completed construction projects: 5,300 cubic meters of concrete pouring, 447 tons of steel bars; steel structure installation: 1,100 tons; pipelines: 17,000 meters; static equipment: 32 sets; dynamic equipment: 34 sets; electrical instruments: electrical power, control cables 46 kilometers of laying, 58 kilometers of instrument cables, 4 transformers and 75 panels. Finally, on April 15, 2023, the main construction of the BDO standard renovation project was completed.

Zhu Bo, general manager of the Northwest Branch, said in his speech: After the CCCC, the branch will, as always, give full play to the "Ten Construction" iron army spirit, strive for perfection, complete all finishing construction tasks with quality and quantity, and ensure that the device will be put into production as soon as possible. Qualified product.

广告位
This article is from the Internet, does not represent the position of Epoxy curing agent, reproduced please specify the source.https://www.dmp-30.vip/archives/5399

author:

Previous article
Next article
Contact Us

Contact us

+86 - 152 2121 6908

Online consultation: QQ交谈

E-mail: info@newtopchem.com

Working hours: Monday to Friday, 9:00-17:30, closed on holidays
Follow wechat
Scan wechat and follow us

Scan wechat and follow us

Follow Weibo
Back to top
Home
Phone
Products
Search