Epoxy curing agent News Heavy! Wanhua Chemical’s 560,000-ton/year chemical project is about to start construction

Heavy! Wanhua Chemical’s 560,000-ton/year chemical project is about to start construction

广告位

Recently, Wanhua Chemical (Penglai) Co., Ltd.’s second-phase project of acrylic acid and ester publicized the draft environmental impact report for comments.

It is reported that the project will build a new 160,000-ton/year acrylic acid plant, a 400,000-ton/year butyl acrylate plant, and supporting public works and auxiliary facilities, and will be located in Wanhua Penglai Industrial Park, Penglai Chemical Industrial Park.

Previously, on October 7, 2022, Wanhua Chemical Group held a discussion meeting on the scale adjustment plan of the acrylic acid and ester project. The owner proposed that the scale of the project should be changed from the original one set with an annual production capacity of 160,000 tons to two sets, which will be constructed in two phases. At the same time, it is required that two phases of installations be arranged on the land occupied by the general plan, with simultaneous design, simultaneous construction, and simultaneous start-up.

广告位
This article is from the Internet, does not represent the position of Epoxy curing agent, reproduced please specify the source.https://www.dmp-30.vip/archives/13901

author:

Previous article
Next article
Contact Us

Contact us

+86 - 152 2121 6908

Online consultation: QQ交谈

E-mail: info@newtopchem.com

Working hours: Monday to Friday, 9:00-17:30, closed on holidays
Follow wechat
Scan wechat and follow us

Scan wechat and follow us

Follow Weibo
Back to top
Home
Phone
Products
Search