Epoxy curing agent News Binhua Carbon Three Carbon Four Comprehensive Utilization Project LPG raw material sea channel officially opened

Binhua Carbon Three Carbon Four Comprehensive Utilization Project LPG raw material sea channel officially opened

广告位

Binhua Carbon Three Carbon Four Comprehensive Utilization Project LPG raw material sea channel officially opened

At 14:58 on October 15, the "Yuyou Spirit" ship, which traveled across the ocean from Houston, USA, and loaded with low-temperature propane, successfully berthed at berth #8 of Binzhou Port after 36 days of sea voyage. This is the first foreign trade VLGC ship to arrive at Binzhou Port since its establishment, marking the official completion of the sea channel for LPG raw materials of Binzhou Chemical Group’s carbon three and four comprehensive utilization project.

With the strong support of Binzhou City governments at all levels and relevant municipal departments, Binzhou Maritime Safety Bureau, Binzhou Customs, etc., Binhua Group has cooperated with Shandong Provincial Port Group Binzhou Port Co., Ltd., Binzhou Transportation Investment and Development Group Co., Ltd. and other units to focus on raw materials Detailed preparations were made for the entire process of berthing the transport ship and receiving and unloading raw materials, ensuring the safe and smooth conduct of this operation.

After preliminary preparation work such as joint inspection and unloading inspection, low-temperature propane began to be continuously input to the low-temperature tank area of ​​Binzhou Port through the unloading arm. After 27 hours of careful operation, the loading and unloading task was successfully completed at 11:36 on the 17th.

The C3C4 comprehensive utilization project is a major project in Shandong Province and is also the leading project for the development of large-scale chemicals and bulk high value-added chemical new materials in Binzhou's port industry. The raw materials required for the project, propane (C3) and butane (C4), are mainly transported from abroad to Binzhou Port by low-temperature LPG ships and unloaded into the low-temperature tank area behind berths 8# and 9#. The tank farm has four 80,000-cubic-meter low-temperature storage tanks, which not only ensures the supply of raw materials for the project, but also satisfies the raw material supply of Binzhou Lingang Chemical Industrial Park, enriches the low-temperature LPG cargo types in the entire Bohai Bay area, and radiates and stimulates large-scale chemical companies in surrounding areas. development is of great significance.

广告位
This article is from the Internet, does not represent the position of Epoxy curing agent, reproduced please specify the source.https://www.dmp-30.vip/archives/23824

author:

Previous article
Next article
Contact Us

Contact us

+86 - 152 2121 6908

Online consultation: QQ交谈

E-mail: info@newtopchem.com

Working hours: Monday to Friday, 9:00-17:30, closed on holidays
Follow wechat
Scan wechat and follow us

Scan wechat and follow us

Follow Weibo
Back to top
Home
Phone
Products
Search