Remove dirt and grease on the surface of the substrate, and spray the area to be filled with a little water mist
Construction and use within the temperature range of 0℃ ~ 40℃. If construction is carried out in cold seasons, in order to ensure the use effect , it is recommended to preheat the tank in a 30°C environment
Shake it up and down for more than one minute before construction. Please keep the tank upside down during construction
After each tank construction is completed , please use a special cleaning agent to clean the threaded part of the glue gun. After each continuous construction, please use a special cleaning agent to clean the entire glue gun barrel to avoid solidification and blockage.
Please repair and cut after the foam is completely cured and formed. , it is worth noting that cutting off the skin of the foam will reduce the strength of the foam and reduce the sealing and waterproofing effect of the foam
This product is not UV resistant, and it is recommended to further apply glue covering and painting.