(1) Check whether the mortar joints in the masonry are full. If they are not full, they must be filled and leveled before applying the interface agent;
(2) The floating ash on the masonry surface must be removed before painting;
(3) Mix the interface agent with fine sand (fineness modulus below 2.0) at a ratio of 1:1~1.5, add about 55~65% water by mass of the interface agent, and stir into a thick consistency The slurry needs to be stirred evenly;
(4) A roller or brush can be used to brush, to avoid making the slurry thinner or out of proportion for the convenience of brushing;
(5) The prepared slurry should be stirred intermittently during the construction process to prevent precipitation;
(6) The prepared slurry must be used up within 2 hours. The dried mortar It should be discarded;
(7) This product must not be mixed with other materials.
Execution standard: JC/T907-2002
</p