Taking the adhesive board insulation project as an example, if all existing two-component mortar products (BM/AB) are used, 12-13kg per square meter will be required. If the company only provides glue, it will generally be (2-2.5)kg/ ㎡ is enough, and the remaining 10 ㎏ is mainly fillers such as cement and quartz sand, which can be solved on site. For thermal insulation projects involving rubber powder and polystyrene granules, the company can only provide thermal insulation rubber powder (per ㎡ per ㎝ thickness of the insulation layer: 1.5㎏) and anti-cracking agent (KL-1, 1.2-1.4㎏/㎡), and the remaining products For example: cement, sand, mesh cloth, anchors, and steel wire mesh can be solved on-site.
Rubber powder polystyrene particle external insulation system (paint finish)
Application fields:
1) Suitable for hot summer and cold winter areas and hot areas in my country Exterior wall insulation and roof insulation projects of civil and public buildings;
2) Suitable for stairwell insulation projects of civil and public buildings in severe cold and cold areas in my country;
3) Applicable Surface leveling treatment and auxiliary insulation project for large mold built-in insulation system (cast-in-place with mesh and cast-in-place insulation board without mesh);
4) Suitable for surface leveling treatment project of polyurethane spray exterior wall insulation system.
5) Suitable for energy-saving renovation projects of new buildings and existing buildings. </p