According to the website of the National Development and Reform Commission, the National Development and Reform Commission and other three departments issued the "Guiding Opinions on the Implementation of the Rural Power Grid Consolidation and Upgrade Project": By 2025, the rural power grid structure will be stronger, the equipment level will continue to improve, digital, intelligent Initial results have been achieved in the development of industrialization; the power supply capacity and quality of power supply have been steadily improved, and the power supply reliability rate, comprehensive voltage qualification rate, and distribution transformer capacity per household in rural power grids in the eastern region are not lower than 99.94%, 99.9%, and 3.5 kVA respectively. The Northeast region shall not be lower than 99.85%, 99.2%, and 2.3 kVA respectively, and all regions shall formulate their own regional development goals based on actual differences; the carrying capacity of distributed renewable energy in rural power grids shall steadily increase, the replacement of electric energy in rural areas shall continue to advance, and the level of electrification shall be steady The self-supporting capability of electric power is gradually improved.
Three departments: by 2025 the average distribution transformer capacity in the eastern region will not be less than 3.5 kVA
This article is from the Internet, does not represent the position of Epoxy curing agent, reproduced please specify the source.https://www.dmp-30.vip/archives/3790