Epoxy curing agent News The total investment is 10.9 billion! Zibo 280 000 tons of propylene oxide project EIA publicity

The total investment is 10.9 billion! Zibo 280 000 tons of propylene oxide project EIA publicity

广告位

The total investment is 10.9 billion!  Zibo 280 000 tons of propylene oxide project EIA publicity

Recently, the Zibo Ecological Environment Bureau announced the acceptance of environmental impact assessment documents for the 280,000 tons of propylene oxide and 600,000 tons of engineering materials green intelligent manufacturing projects of Shandong Huifeng Petrochemical Group Co., Ltd.

It is reported that the total investment of the project is 10,928,721,600 yuan, covering an area of ​​104.4 hectares, and the project planning covers a total area of ​​1566.36 mu. The project mainly constructs 900,000 tons/year catalytic cracking unit, 200,000 tons/year cracking light aromatics hydrofining unit, 280,000 tons/year propylene oxide co-production 600,000 tons/year styrene unit, 300,000 tons/year Polystyrene plant, 300,000 tons/year ABS device and its supporting facilities. Purchased more than 4,000 sets of equipment. Production of 279,700 tons/year of propylene oxide, 600,000 tons/year of styrene (442,300 tons for self-use, 164,100 tons 10,000 tons), 158,800 tons/year of ethylbenzene, 300,000 tons/year of polystyrene, 1.3 million tons/year of ABS, 3,400 tons/year of propylene glycol, 0.34 million tons/year of polyethylbenzene, 0.06 10,000 tons/year non-aromatics, 30,300 tons/year tar, 75,600 tons/year C6-C7, 116,300 tons/year C8+, 24,200 tons/year propane, 92,100 tons/year C4, 111,400 tons/year 10,000 tons/year of methane hydrogen, 1,200 tons/year of acid gas H2S.

According to the publicity documents, the project meets the requirements of the national industrial policy; after implementing various pollution control measures, the project meets the local environmental function requirements; the total amount of pollutants held meets the total amount control requirements; engineering risks can be effectively controlled; The management requirements of "Three Lines and One Order"; no public objection to this project has been received. Under the premise of fully and fully implementing various environmental protection measures proposed in this report, the construction of this project is feasible.

广告位
This article is from the Internet, does not represent the position of Epoxy curing agent, reproduced please specify the source.https://www.dmp-30.vip/archives/4578

author:

Previous article
Next article
Contact Us

Contact us

+86 - 152 2121 6908

Online consultation: QQ交谈

E-mail: info@newtopchem.com

Working hours: Monday to Friday, 9:00-17:30, closed on holidays
Follow wechat
Scan wechat and follow us

Scan wechat and follow us

Follow Weibo
Back to top
Home
Phone
Products
Search