Epoxy curing agent News Wanhua Chemical’s 120,000-ton-per-year thermoplastic polyurethane elastomer expansion project (Phase II changes) environmental impact report released for public comment

Wanhua Chemical’s 120,000-ton-per-year thermoplastic polyurethane elastomer expansion project (Phase II changes) environmental impact report released for public comment

广告位

Recently, the draft environmental impact report of Wanhua Chemical Group Co., Ltd.’s 120,000-ton thermoplastic polyurethane elastomer expansion project (phase two changes) per year was released.

Construction project overview (after changes)

Project name: Thermoplastic polyurethane elastomer expansion project with an annual output of 120,000 tons (second phase change)

Project nature: expansion (resubmission for approval)

Construction unit: Wanhua Chemical Group Co., Ltd.

Construction location: Located in the existing TPU device area of ​​Wanhua Chemical West District, Yantai Chemical Industrial Park, Yantai Economic and Technological Development Zone, no new construction land will be used

Project overview: This project will build 3 new polyol production lines and 2 TPU production lines, with a production scale of 40,000 tons/year polyester polyol and 50,000 tons/year TPU, related heating, water supply, gas supply and other public projects and environmental protection The projects all rely on Wanhua’s existing facilities.

Details and reasons for project changes

Wanhua Chemical Yantai Industrial Park is constructing TPU devices in three phases, all of which have obtained environmental impact assessment procedures. The current total TPU production capacity is 210,000 tons/year. The first phase of the project will build a 60,000 ton/year polyol unit and a 60,000 ton/year TPU unit; the second phase of the project will build a 25,000 ton/year polyol unit and a 30,000 ton/year TPU unit; the third phase of the project will build a 90,000 ton /year polyol plant, 120,000 tons/year TPU
device.

The third phase of the project is the “120,000 tons of thermoplastic polyurethane elastomer expansion project per year”. The project was approved by the Yantai Municipal Ecological Environment Bureau in September 2019 (Yantai Environmental Protection Examination [2019] 38
No.), the main construction content includes a 90,000 tons/year polyester polyol plant and a 120,000 tons/year TPU plant.

In order to achieve product diversification, high added value, and further improve product competitiveness, Wanhua Chemical decided to change the construction content of Phase 3-2. The main changes include changes in raw and auxiliary materials and changes in production lines. Projects before and after the change The production capacity remains unchanged. After the change, the main construction content is to build 3 polyol production lines and 2 TPU production lines, with a production scale of 40,000 tons/year polyester polyol and 50,000 tons/year TPU.

广告位
This article is from the Internet, does not represent the position of Epoxy curing agent, reproduced please specify the source.https://www.dmp-30.vip/archives/51361

author:

Previous article
Next article
Contact Us

Contact us

+86 - 152 2121 6908

Online consultation: QQ交谈

E-mail: info@newtopchem.com

Working hours: Monday to Friday, 9:00-17:30, closed on holidays
Follow wechat
Scan wechat and follow us

Scan wechat and follow us

Follow Weibo
Back to top
Home
Phone
Products
Search