Epoxy curing agent News Xinjiang Lize Hongqing New Energy plans to build projects with an annual output of 200,000 tons of BDO and 100,000 tons of spandex

Xinjiang Lize Hongqing New Energy plans to build projects with an annual output of 200,000 tons of BDO and 100,000 tons of spandex

广告位

Recently, the carbon dioxide hydrogenation to low-carbon methanol project located in the Sula Palace Industrial Park in Yining City has been progressing smoothly since the start of construction in June. The site leveling has been completed and the construction of the office has begun building.

It is reported that the total investment of the project is 15.58 billion yuan, which is invested by Xinjiang Lize Hongqing New Energy Co., Ltd. and will be constructed in two phases. The total investment of the first phase of the project is 580 million, and it is expected to be put into operation in June 2025. It mainly constructs syngas fine desulfurization, methanol synthesis, hydrogen recovery, methanol rectification and supporting transformation and distribution stations, comprehensive water supply system, sewage treatment system, etc., and at the same time A 30-kilometer CO2 long-distance pipeline will also be built. After the project is completed, the production capacity will reach 100,000 tons/year. After the first phase is put into production, it can realize an annual sales income of 250 million yuan, profits and taxes of more than 48.7 million yuan, and provide employment for more than 100 people.

Li Tao, general manager of Xinjiang Lize Hongqing New Energy Co., Ltd., said: "At present, the first floor of the production and office building project is capped, and the second floor will continue to be built. It will be a million-ton green methanol project and will be extended Production of dimethyl carbonate, degradable polymers and spandex and other high value-added products.”

In addition, the second phase of the project has a total investment of 15 billion yuan. It is planned to produce million-ton green methanol, and some methanol will be further processed to produce 1-4 butanediol (BDO), spandex, degradable polymer (PBS), dimethyl carbonate (DMC) and other high value-added products. Among them, the production capacity of 1-4 butanediol (BDO) is 200,000 tons/year, degradable polymer (PBS) is 100,000 tons/year, dimethyl carbonate (DMC) is 100,000 tons/year, and spandex is 100,000 tons/year. The second phase will start construction in 2025 and is expected to be put into operation in 2028. After it is put into production, it can realize an annual sales income of 11 billion yuan, a profit and tax of 3 billion yuan, and provide employment for more than 1,500 people.

广告位
This article is from the Internet, does not represent the position of Epoxy curing agent, reproduced please specify the source.https://www.dmp-30.vip/archives/7042

author:

Previous article
Next article
Contact Us

Contact us

+86 - 152 2121 6908

Online consultation: QQ交谈

E-mail: info@newtopchem.com

Working hours: Monday to Friday, 9:00-17:30, closed on holidays
Follow wechat
Scan wechat and follow us

Scan wechat and follow us

Follow Weibo
Back to top
Home
Phone
Products
Search